Achievements
The major achievements during past years areProjects
- Achieved more than 2 Million man hours without LTI in last 4 years operation.
- Completed more than 170 km of FBE coated 6" flowline jobs for PDO as LCC sub-contractor to Galfar.
- Completed the Demolition of various non-performing assets within PDO North Oman
- Completed the up gradation of Saih Rawl Oil Station by removing the 2 storage tanks and prepare the space for new project.
- Completed Construction of Bund Wall for Dehydration tank farm for PDO Yibal A Station.
- Construction Manpower support to GS Engineering & Construction for PDO SNDC Project.
- Construction Manpower support to STS and Petrofac for PDO Harweel Phase 2 Project.
- Construction Manpower support to STS for Kawther / SR CPP Shut down Projects.
- Construction of 8" Duplex Stainless Steel Test Headers from SRS-G, SRS-2, SRS-H to SRS CGS at Saih Rawl, PDO North Oman. (GG Well test project)
- Sub-Contract of Civil and Mechanical Works for Special Technical Services LLC (STS) Engineering Maintenance Contract (EMC) with PDO North Oman
- LCC Sub-Contract of Civil and Mechanical Works (Flow Lines and Headers, Earth Works, Drill Location, Concrete Works, Cellar Works, Steel Works, Pipe Works, Equipment, Gate Fabrication, Miscellaneous works) for Galfar Engineering and Contracting SAOG Off-plot Delivery Contract with PDO North Oman.
- Construction of SR- 71P Flow line at (Class1 Pipeline) Saih Rawl field.
- Construction of SR-302 & SR 93P Oil Flow line from Well Head to SRL Oil Gathering Station for STST/PDO.
- Decommissioning, removal and shifting of non performing operation equipment from PDO North Oman operating field STST/PDO.
- Fabrication and erection of pipe rack at Saih Nyadha Depletion compression project.
- Decommission, sludge out and demolish crude storage tank at Burhan operating facility.
- Carried out minor Shout-down activities in PDO north Oman areas.
- Installation of Argonite Fire Suppression System for 8 Nos. Overhead cranes at Port of Salalah
- Shop Fabrication services for GS Engineering field project site Saih Nyadha North Oman.
- Construction of class 1 gas pipe line MQL-5 To MQL South RMS for STST/PDO on Yibal
- Demolition of pilot steam injection plant Qarnalam.
- Achieved more than 1 Million man hours without LTI in last 4 years operation.
- Operation and Maintenance of 6 STP Units in PDO Qarnalam and Kawther.
- Non-hazardous waste management at Qarnalam, Saih Rawl and Kawther field.
- Pest Control and landscape for Qarnalam field including rig camp location.
- Waste management and pest control of Petrofac Kawther field project site.
- Waste management and pest control of PDO Qarnalam field project site
- Waste management and pest control of SRDC Phase 2 (L&T Oman field project site
- Operation and Maintenance of STP Units for PDO Qarnalam & Saih Rawl
- Operation and maintenance of PDO Qarnalam area Sewage Treatment plants
- Waste management and pest control of CC Energy field project site (block 3 & 4).